High-performance networksDELIVERED

Network engineering, optical expertise and supply-chain knowledge. We design, source and integrate infrastructure for carriers, datacenters and AI.

Engineering

Network Architecture

The fabric, optical path, routing policy and host configuration have to work together. Our engineering spans the design choices, integration details and measurements that determine how the installed network behaves.

How we structure delivery

Accelerated computing

AI/ML fabric architecture

Training, distributed inference and storage place different demands on a network. We design AI/ML fabrics from the communication pattern outward, then tune the hosts, transport and switches as one system.

Topology, rails and bandwidth

Map collective communication, job placement and storage traffic to the fabric. Evaluate rail alignment, shared versus dedicated traffic networks, and single- or multi-plane Clos topologies.

Size switch radix, bisection bandwidth and oversubscription for the job scale. Account for all-to-all traffic, incast, expansion and the capacity that remains during a failure.

RoCE and congestion control

Align DSCP or PCP classification, traffic classes, queues and scheduling across NICs and switches. Coordinate ECN marking, CNP feedback and endpoint rate control such as DCQCN where supported.

Select lossless operation with PFC and ECN, or an ECN-based lossy design supported by the platform. Tune thresholds and rate control against the actual ASIC, NIC and workload.

Lossless QoS and PFC headroom

Where PFC is used, confine it to the required priorities. Set XOFF/XON thresholds and buffer headroom for the ASIC, line rate, MTU, cable length and pause-response delay.

Check pause propagation, head-of-line blocking and deadlock recovery. Use congestion feedback to control load before sustained pausing spreads through the fabric.

Path selection and load balancing

Test ECMP hashing, flow entropy and collisions against collective traffic. Evaluate adaptive routing or packet spraying only when the switch and transport support them.

Measure path imbalance, reordering and recovery during link failures. Balance steady-state throughput against the behavior of the surviving fabric.

GPU, NIC and host tuning

Resolve PCIe topology, GPU-to-NIC affinity, NUMA placement and GPUDirect RDMA prerequisites. Check peer access, ACS/IOMMU behavior and firmware, driver and communication-library compatibility.

Align MTU and traffic marking end to end. Account for topology visibility in containers or VMs, and the interaction between backend, storage, frontend and management networks.

High-speed links and cabling

Evaluate 400G, 800G and 1.6T interfaces against the exact switch, NIC and module support. Match electrical lanes, breakout modes, FEC, thermal limits and management behavior.

Verify optical levels, fiber polarity, connector cleanliness and loss. Correlate lane errors, uncorrectable FEC events and link flaps with stalled communication.

Verification in practice

Workload performance. RDMA throughput and latency, plus NCCL or equivalent collectives across representative message sizes, scales and placements.

Congestion and resilience. Collective completion time alongside queue occupancy, ECN/CNP activity, PFC duration and physical errors, including competing traffic and failures.

Supply chain & procurement

Sourcing constrained optics and network hardware

We source constrained optical transceivers and network hardware, negotiate pricing and check alternatives against the deployment requirements. Manufacturer access, technical qualification and delivered cost all shape the purchasing decision.

Access to constrained supply

We identify workable sources for high-speed transceivers and network hardware using our knowledge of manufacturers, distribution channels and component availability.

We check manufacturer and part identity, exact configuration, quantities and delivery requirements with each source, and distinguish confirmed availability from indicative lead times and proposed alternatives.

Pricing and commercial judgment

We evaluate how volume, sourcing route, lead time and support terms affect price. We negotiate with the component requirements and market conditions in view.

Delivered cost, freight, payment terms and warranty coverage all belong in the comparison. We put those details alongside the technical specification so you can evaluate complete offers.

Alternatives with technical evidence

We assess substitutes against host support, electrical and optical interfaces, FEC, power, temperature and fiber requirements.

We define the qualification and approval needed before an alternative enters the bill of materials. Vendor coding or a matching headline data rate does not establish system compatibility.

Purchasing around the deployment

We build a coordinated sourcing plan for switches, routers, optics, fiber, licenses and spares, with quantities and delivery phases tied to installation windows.

We track long-lead dependencies, substitutions and expansion needs, keeping purchasing decisions connected to the configuration that engineering has qualified.

Optical transceivers

Optical transceivers are a particular strength. We work through the required interface, qualify alternatives, identify available supply and compare the complete delivered cost.

Discuss your sourcing needs

Strategy & insight

Network planning and investment decisions

We assess interconnection, facilities, fiber routes and technology choices against traffic demand, capacity, operating cost and expansion plans.

Interconnection and network economics

We evaluate transit, public exchanges and private peering against traffic destinations, volume, latency and reach.

Ports, transport, cross-connects and operational overhead all affect the economics. We connect the commercial choice to routing policy, capacity thresholds and resilience.

Facilities and geographic expansion

We compare sites by carrier access, power, cooling, density and room to grow, alongside the datacenter interconnect and replication needs of the compute footprint.

We map circuit delivery, cross-connect availability and migration dependencies before committing to a location or schedule.

Technology and investment timing

We assess switches, optical interfaces and AI-fabric options against workload requirements, software maturity and the installed environment.

Lifecycle cost, support, power and migration effort inform the recommendation: adopt a new platform, qualify an alternative or use existing infrastructure for the next phase.

Fiber routes and shared risk

We examine available route records, conduit, building entrances and carrier handoffs to identify common failure points. Separate providers do not necessarily provide physical diversity.

We distinguish confirmed routes from assumptions and outstanding surveys, then assess build-versus-buy options, construction dependencies and restoration requirements.

Investment and expansion plans

We develop a phased plan with investment priorities, capacity triggers, dependencies and decision points. We document the assumptions and evidence behind each choice so the plan can change as demand, technology and supply conditions evolve.

Discuss your next phase

Project delivery

Deployment planning and acceptance

A deployment connects engineering decisions to purchase commitments and operating responsibility. We structure the work around an agreed scope: what Petabit delivers, what your team and other suppliers own, and how the result will be accepted.

Define the design basis

Establish the workload, topology, capacity, failure behavior and physical constraints. Set the deliverables, interfaces between teams and acceptance criteria before equipment choices become purchase commitments.

Qualify the bill of materials

Connect exact hardware, firmware, interface modes and cabling to the design. Identify the evidence needed to qualify alternatives, alongside source availability, commercial terms, warranty coverage and spares.

Sequence supply and integration

Tie quantities and delivery phases to site readiness and installation windows. Track long-lead dependencies and configuration changes. Use testable stages, with clear prerequisites and rollback points, to carry the plan into service.

Verify and hand over

Evaluate the installed system against the agreed tests. Record the configuration, test conditions, results and unresolved exceptions. Bring as-built records, recovery procedures, ownership and escalation paths into the handover.

Deliverables and responsibilities

Engineering, component supply and integration can be scoped individually or together. The agreed scope sets the deliverables, acceptance process and support responsibilities for that engagement.

Discuss a deployment